Services
  • Enterprise:Guangxi Xingguang Power Engineering Co.,Ltd.
  • Cellphone:13877101666
  • Phone:0771-3805033
  • Fax:0771-3805099
  • Hotline:4008-333-086
  • Website:www.gxxgpower.cn
  • the site of factory:Guangxi high tech Zone Gaoxin Avenue West Nanning City, No. 15
Product technology
  • Product technology
  • Services>
  • Home>
  • Your present position:

Diesel generator sets the rules for safe operation

Release date:2014/11/05 click:times

A, diesel powered generators, the part of engine operation according to the relevant provisions of the implementation of internal combustion engine.

Two, the generator must be carefully checked before the start of each part of the wiring is correct, each connecting part is reliable, whether brush is normal, the pressure to meet the requirements, the grounding wire is good.

Three, before the start of the excitation rheostat resistance on the maximum position, disconnect the output switch, a generator should clutch disengaging the clutch. First start the engine idling, stable operation and then start the generator.

Four, the generator started after the operation, should always pay attention to have no mechanical noise, abnormal vibration etc.. Confirm normal, adjust the generator to the rated speed, the voltage to the rated value, and then close the output switching power supply, outward. The load should be gradually increased, to the three-phase equilibrium.

Five, the generator parallel operation must meet the same frequency, voltage is the same, the same phase, phase sequence the same conditions to.

Six, prepare for parallel operation of generator must have entered the normal and stable operation.

Seven, received the "signal to parallel", to the whole device shall prevail, adjust the engine speed, the synchronous closing moment.

Eight, parallel operation of generator should adjust load, active power equilibrium distribution of each generator and reactive power. Active power regulation through the throttle diesel engine, reactive power regulation by excitation.

Nine, the operation of the generator should pay close attention to the engine sound, to observe all kinds of machine instructions is in the normal range. Check the operating part is normal, the generator temperature rise is too high. And record the operating.

Ten, parking, the first load reduction, the excitation rheostat reply, so that the voltage drop to the minimum value, and then sequentially cut off switch, the last stop of diesel engine running.

Diesel engine eleven, parallel operation as a result of decreased load and need to stop one, should first will need parking a generator load, all transfer to continue operation of the generator, and then according to the method of single generator parking parking. For all parking the first load is cut off, and then press a single generator outage management.

Twelve, mobile generator, used to be an underframe Parking Based on the stationary, mobile no operation.

Thirteen, the generator in operation, even if the excitation without, should also be considered with voltage. The prohibition of outgoing line of work in the spin of the generator and touch the rotor or cleaning. In the operation of generator may use materials such as canvas cover.

Fourteen, the generator after repair must carefully check the rotor and stator slot with or without tools, materials and other debris, the damage of a motor so as not to run.

Fifteen, the engine room all electrical equipment must be reliable grounding.

Sixteen, prohibit piling up debris and flammable and explosive articles, in addition to the staff on duty, the prohibition of other personnel to enter without permission.

Seventeen, the housing should be provided with the necessary fire fighting equipment, should immediately stop power supply, close the generator fires occur, and carbon dioxide or carbon tetrachloride extinguisher extinguishing.

Eighteen, if not understand, can call the company I phone 0771-3805033 4008333086 consulting related technical problems.